Getting it up the mast

Around the mast, above the clutter, where the unit can see everything. Which fitting your vessel needs comes down to the mast itself — and a survey settles it.

3
Fitting routes
1
Mast position
1
Cable run
0
Blind spot at the mast
What it is

Every Panoblu goes up the same way

Around the mast, above the clutter, where the unit can see everything. What changes from vessel to vessel is the fitting that gets it there — and that comes down to the mast itself. One measurement settles it for almost every motor yacht, and a survey turns that measurement into machined brackets that fit the section they were made for.

Which fitting, from one measurement

Take the outside diameter of the mast section where the unit will sit. That single number picks the fitting in almost every case.

Under 130 mm Standard kit

Around-the-mast brackets for the slimmer section — the standard fit on most motor yachts in the range.

130 – 200 mm Wider kit

A wider body and bracket set for a heavier section, machined from the surveyed measurement.

Larger, or twin-mast Dual install system

Two units fused into one seamless panorama, arranged with the yard for the rig in front of you.

Sailing yachts and twin-mast layouts go to the dual install system whatever the diameter. Two units fused into one interface answer the rig that a single masthead position cannot: the sail plan moves, and two positions keep the panorama complete.

The fittings

What the family contains

Four items, and the mast chooses between the first three. All of them are machined to the measurement rather than adjusted on the day, which is why the survey comes first.

Fitting Under 130 mm Installation kit · slimmer mast

Around-the-mast brackets machined for a section under 130 mm, the standard fit on most motor yachts. One bracket set, one cable route, one power run.

Fitting 130 – 200 mm Installation kit · wider mast

A wider body and bracket set for a heavier mast section, again machined from the surveyed measurement. Specify this one as soon as the mast measures over 130 mm.

Fitting Two units Dual install system

Two units, fused in the interface so the crew still sees one panorama. The answer for larger masts, twin-mast arrangements and sailing yachts where the rig moves. The arrangement, the brackets and the interface work are agreed with the yard, and the on-board server software runs alongside it.

Finish RAL Custom exterior colour

The housing finished to the vessel’s own RAL code, so it reads as part of the mast rather than an addition to it. Worth raising early: it carries a three-month lead time and belongs in the build schedule rather than the week before delivery.

  • RAL code confirmed with the order
  • Three-month lead time
See it on the model Mast mounting, in three dimensions

The mast-mounting page walks through the three ways the unit goes up — hanging below a spar, seated on a platform, or clamped to the mast itself — and lets you spin the unit and switch the coverage volumes on and off to see how the sectors meet around the mast.

Survey first

The measurement pays for itself

A survey is the single best thing anyone can do for the schedule. It settles the diameter, the cable route and the arrangement, and it turns an estimate into a firm plan before the yard commits anyone’s time.

Step 01 Start from the stated diameter

The mast section you already know about picks the likely fitting, so the project can be planned as a whole from day one rather than in pieces.

Step 02 Survey the mast

A survey day settles the diameter, the cable route and the arrangement, and confirms which fitting will be machined. Everything downstream gets easier from here.

Step 03 Credited to the project

A pre-sale vessel survey becomes the project’s first day of work once the installation proceeds, so the time spent looking follows the vessel into the build.

What to expect

An installation designed before it is fitted

The fitting is the part of the project that touches the vessel, so it is the part worth being precise about.

Machined, not adjusted

Brackets are made for the section they will sit on. That is why the measurement matters and why the survey comes before the order rather than after it.

One mast position, one cable run

The whole system arrives in a single housing, so the fitting is one place on the mast, one cable route and one commissioning — not a set of positions to negotiate.

The mast is not a blind spot

The lenses sit in a ring around the housing, so where one lens sees the mast its neighbours already see past it on both sides. Seen from overhead the sectors meet all the way round.

Next step

Quoted per vessel, through partners

What this needs alongside it — the mounting kit, the installation days, the software — depends on your mast and your vessel. A Panoblu partner surveys it and quotes the components it actually needs. Tell us where you are, and we will introduce you to the right one.